Before and after
Real jobs look like this: what the customer saw, what we found, what we did and the bill.

Before 
After Burnt socket in a bedroom
Replaced the socket and plate, tightened the wiring at the board, and fitted a 16 A socket for the heater on its own circuit.
Paid ₹1,129, 1 hour 10 minutes
Generated sample photos, not a real job. A real business uses its own, taken with the customer's permission.

Before 
After Leaking kitchen sink waste pipe
Cleared the block and fitted a new PVC bottle trap and waste pipe.
Paid ₹647, 50 minutes
Generated sample photos, not a real job. A real business uses its own, taken with the customer's permission.

Before 
After Corroded bathroom tap
Replaced the tap with a new brass chrome-plated one and resealed the wall flange.
Paid ₹848, 25 minutes
Generated sample photos, not a real job. A real business uses its own, taken with the customer's permission.

Before 
After Old fuse board replaced with MCBs and an RCCB
Fitted a metal distribution board with a 30 mA RCCB and six MCBs, labelled each circuit, and ran the wires in conduit.
Paid ₹7,850, 5 hours
Generated sample photos, not a real job. A real business uses its own, taken with the customer's permission.
- The photos in this template are generated samples, labelled on each job. A real business replaces them with its own photos, taken with the customer's permission.